We have performed the design of the sewer lift station in Royal Commission-Yanbu, which will serve Community 2 and the force main line from the list station up to the step-down chamber.
We have also performed Hydraulic analysis of the Irrigation network in RC Yanbu, along with the task to determine the various parameters for the design of the irrigation pump station.