Rashid Mall

Rashid Mall

Description
  • Performed Hydraulic Analysis for the secondary circuit to verify the compatibility of the system for the expansion of additional buildings connections from the existing chiller plant.
  • While analysing the secondary pumping system, the following points were considered to prepare a more comprehensive report.
  • Capability of the secondary pumping system to hydraulically handle the new flow requirements along with the existing flow.
  • Capability of the cooling system to satisfy the new load.