
We are performing the role of technical and the design consultant to the client for the assessment of the complete HVAC system in KFIA and upgradation of the existing HVAC system with Energy Efficient systems. The central plant capacity is 25,000 TR. Our scope also included evaluation of the existing Chilled water system and performed Hydraulic analysis. The project covered the below building of the KFIA facility:-