1. Site investigations
2. Evaluation of the existing HVAC system
3. Preparation of revised heat load calculations and identify the required air flowrate Demolition / Modification Drawing, as required
4. Evaluation of the existing chilled water flow requirements and providing solutions for the enhancement of the HVAC system.
5. Preparation of construction package as pe Saudi Aramco standards and procedures